CIVIL ENGINEERING

ABOUT US
ABOUT USA valued brand, capable of delivering quality solutions.
CIVIL ENGINEERING
CIVIL ENGINEERINGComprehensive and deliverable project solutions.
PROPERTY FLOOD RESILIENCE
PROPERTY FLOOD RESILIENCEAlleviate the effects of flooding.

Client

£900,000

Value

13 weeks

Duration

Constructing a new car park for Royal Derby Hospital, works included installation of a new drainage system, attenuation tank, ducting and construction of circa 600 parking spaces.

Working on a Design & Build basis, we engaged with our tried and trusted designers and specialist supply chain to develop best value solutions for Royal Derby Hospital.

Establishing hospital requirements and specification on both the car park and drainage solutions, we value engineered the scheme based on previous experience and technical knowledge.

Engaging with our specialist suppliers Triton to deliver an innovative stormwater drainage system saw circa £50,000 savings in outturn costs. The eco-friendly design has a 120-year lifespan, reduces future maintenance requirements, whilst allowing safe installation with minimal manual handling required on site.

Recommending a Huesker reinforced design for the car park construction saw a significant cost saving, alongside a reduction in the amount of muck away and virgin aggregate required. Our Contracts Manager, having utilised this technique on previous schemes, highlighted the environmental benefits to Royal Derby Hospital, including reduced carbon footprint and less HGV movements.

With experience and knowledge of previous similar schemes, coupled with maintaining working relationships with our tried and trusted supply chain, we provided the best value solution for Royal Derby Hospital.

Allocating our directly employed personnel with the necessary skills, knowledge, ability, training and experience allowed ‘right first time, every time’ delivery in a safe and efficient manner to a high-quality standard.

Click here to view this case study as a PDF.